24 months · commitments, not measurements

From bench-validated to institutionally proven

Three phases, each closing on measurable KPIs. Full quarterly roadmap in the technical paper (§11); the 24-month commitments below are the grant/term-sheet view (memorandum M.8).

Phase A · months 0–6 · Joint Lab Stand up the entity and the testbeds
  • WFOE registration complete
  • Edge/local parity 29/29 (from 20/29; committed Dec 2026)
  • Knowledge coverage ≥ 75% (from 47.8%)
  • SDR / PLC / glitch testbeds operational
  • Shenzhen municipal grant decision filed
Phase B · months 6–12 · Compliance Prove residency and latency
  • Shenzhen AZ live · PIPL audit passed
  • CVE-to-lure median < 2 h (measured baseline: < 4 h)
  • XDP authorized-surface rollout
  • Agent-AIX beta GA · Evidence Packs productised
  • SDR field pilot on authorized sites
Phase C · months 12–24 · Ecosystem Institutionalise the capability
  • ≥ 2 patents filed
  • ≥ 2 standards proposals
  • ≥ 15 Shenzhen jobs created
  • Coverage ≥ 90%
  • Voltage self-audit rig in continuous operation; thermal-zeroization prototype on sacrificial nodes
  • Series A trigger: 10 paying grids or €1M ARR-equivalent
Commitment discipline: every figure above is a commitment — the corpus KPIs (1.22M hits, 45k external-real, 99 sessions) are measurements with snapshot citations, and the two are never mixed on one line. This separation is the evidence-bound doctrine (§8).